Installation of a steam plant with a capacity of 3 t/h, a pressure of 10 bar, a steam boiler with a gas burner, a feed tank, a steam accumulator, with the delivery of part of the equipment in the boiler room: a steam distributor, a condensate tank, steam fittings and pipelines.