“Turnkey” construction of the new heating plant “Senjak” in Pirot. we made the entire mechanical works of the installation of the hot water boiler house, and together with the partners, the complete construction and electrical parts of the project, as well as the central monitoring and control system Neuberger. The works include the administrative part of the building and the accompanying external parts.
In our complete performance, we carried out the delivery, assembly and connection of the cascade of three Buderus Logano S825M boilers with a power of 12.6 + 12.6 + 7.7MW, Weishaupt combined burners, pressure maintenance and expansion systems, fuel oil plant with a tank.
The boilers are connected to three stainless steel chimneys of the German manufacturer RAAB, mounted on a special steel construction, 32 meters high.