Client:
New power plant - city of Loznica
Type of object:
Industrial object
Performed works:
- Designing and building of complete boiling room – turnkey system, total power 16mW. Power plant is run by two Buderus Logano S825 8mW boilers and the other two Buderus Logano S825 1.75mW, using oil fuel and natural gas.